Page 12 - WEB-I3 Insulating Glass Fabrication Supplies and Equipment
P. 12

SECTION 2                                      FHC INSULATING GLASS FABRICATION, SUPPLIES, AND EQUIPMENT
        FHC IG Fabrication Methods                Bulk Quantities Available
                                                   Click to Chat With Us
        FHC Encapsulating Art

        Glass With Super Spacer                                        ®




        Enhancing the energy efficiency of specialty art glass windows has gained
        popularity through the encapsulation of panels within the air space of an
        insulating glass unit. However, it’s crucial to ensure sufficient clearance
        between the art glass and the outer layers to prevent contact during the                     Art Glass
        expansion and contraction of the air space. Equally important is the complete
        curing of all grouting materials used in the art glass fabrication to avoid   Air Space      Air Space
        trapping solvents within the unit, which could potentially cause fogging in the
        future. The process of creating insulating glass units of this kind begins with
        the formation of a guide groove in the Super Spacer®. Subsequently, the Super   Glass       Glass
        Spacer® is securely attached to the art glass panel approximately every two
        or three inches (51 or 76 mm) using an instant adhesive such as our Item No.                 Grooved
        LT40140, with the groove serving as a centering guide. Once this is done, the             Super Spacer®
        release liner on one side of the Super Spacer® is removed, and the panel is
        centered over the first layer of glass. Afterward, the remaining release liner is
        removed, and the second layer of glass is aligned directly over the first one.
        Finally, the unit is sealed using Hot Melt Butyl or Item No. 1G877 Sealant.            Hot Melt Butyl or
                                                                                               IG877 Sealant


        FHC Fabricating                                             - Air Powered
                                                                    - Double Acting Cylinder
        Muntin Grids                                                -  Easy Muntin Change
                                                                   Over
                                                                    -  Durable, Long-Lasting
                                                                   Heat Treated Tool Steel
                                                                    - Interchangeable Dies
        For colonial-style insulating glass units, it’s time to incorporate muntin
        grids into the process. Muntin Bars should be precisely cut to size     - Self-Lubricating Blade
        based on the inner measurements of the spacer frame. Just as with the     -  Accommodates Flat
                                                                   Muntin up to 7/8”
        fabrication of spacer frames, Muntin Bars should be cut using a fine     - Palm Button Operation
        100 to 150 tooth saw blade without the need for oil or coolant. It’s also
        advisable to wear FHC Item No. IGG5L Lint-Free Gloves when handling     - Manual Gauge Bar
        Muntin Bar lengths. Proceed by measuring and marking the points where     -  Operates on Clean Dry
                                                                   Air, 70 to 90 psi
        the muntins will intersect. Then, notch each of the muntins using the
        FHC APSSN1 Air Powered Muntin Notcher, along with the appropriate die
        and punch. Once the Muntin Bar grid is securely fitted together, insert
        the suitable Muntin Bar Clips. For larger Muntin Bar grids, you may need
        to utilize internal muntin joiners. To connect the spacer frames with the
        Muntin Bar Clips, drill or punch at the connecting points using an electric
        hand drill, drill press. Subsequently, assemble the completed Muntin Bar
        grids into the spacer frame. Prior to sealing the unit with Item No. F19A
        Glass Cleaner, ensure that the Muntin Bars are cleaned. Avoid using
        MEK, alcohol, or similar chemicals for cleaning. Apply primary and/or   ITEM NO. APSSN1
        secondary insulating glass sealant following standard procedures.  Muntin Notcher
        NOTE: In scenarios where fabrication
        necessitates prolonged exposure of
        interior surfaces, use a hair dryer or
        hot air gun to eliminate dust particles
        or other contaminants from the
        exposed surfaces.

         Super Spacer is a registered trademark of Quanex Building Products Corp.
                                                                                     Visit fhc-usa.com to search for
                                  THE GLAZING SUPPLY COMPANY                         Muntin Bars
                                                                                     Enter the Item Number or scan QR code with
        IG12                      EXPERIENCE A ND INNO V A TION                      your smartphone for complete product details
   7   8   9   10   11   12   13   14   15   16   17